I know the people and the town of Georgetown. I have worked with the people and the city and know the new resident requirements for Georgetown and Williamson County. I can fill the "Construction and Remodeling Application" out in my sleep. I have worked with the people at the City of Georgetown and believe I have developed their respect as an honest builder that does not cut corners. I appreciate the job they do and feel it is in the customers interest to have impartial inspectors watching over every house built in the area.

The following are required inspections for new residential construction:

I. Foundation

  • Setback
  • Slab

II. Concrete Slab Floor: (before pouring)

  • Plumbing (DWV)
  • Slab Uffer Ground
  • Plumbing (Copper)
  • Electrical (Underground)

III. Concrete Slab Floor: (after pouring):

  • Exterior Wall Cover-up
  • Rough Plumbing / Gas
  • Rough Electrical
  • Rough Heating and Ventilation

IV. Framing, V. Insulation, VI. Wall Board

  • Nailing

VII. Miscellaneous:

  • Gas Final
  • Permanent Power
  • Sewer Connection
  • Water Supply
  • Sidewalks / Driveway

VIII. Final:

  • Electrical Fixtures
  • Plumbing Fixtures
  • HVAC
  • Job Completion

Custom home building does not have to be a stressful

If you build a custom home, unexpected things occur. "Unexpected things" is a all encompossing term, I know, but we just never know what we may encounter when we start to build. It can come from mother nature, the city, an enviornmental issue. If faced alone, these will be daunting, to say the least. If faced with an experienced builder that is by your side, they are but a bump in the road to getting your house built. In fact, as an experienced builder, one of the great joys is relieveing the stress that issues such as these would otherwise bring.

Miscellaneous additional inspections required

I. Decks / Patio Arbors

  • Setback
  • Piers / Foundation
  • Framing
  • Electric
  • Final

II. Fence

  • String Line / Setback
  • Final III. Accessory Building
  • Setback
  • Foundation
  • Framing
  • Electric
  • Plumbing
  • Final

IV. Pools

  • Fencing or enclosure
  • Layout
  • Pool Bonding / Electrical Permit
  • Steel
  • Gas Rough
  • Gas Appliance or Equipment
  • Location
  • Plumbing Rough
  • Gas Final
  • Deck Bonding
  • Deck Steel
  • Final
  • Backflow prevention

V. Signs

  • Setback
  • Height
  • Square Footage
  • Illuminated? If yes, then electrical permit required.